WillCo Drilling Intelligence - Edition 26: The Workflow Becomes the Operating Model

🛢️ Top Story
SLB Selected as Vår Energi's Main Integrated Drilling Supplier, Digital Workflows Included
SLB press release, November 12.
Two harsh-environment semisubmersibles, the Transocean Barents and the Deepsea Bergen, drilling exploration and development wells continuously on the Norwegian Continental Shelf under one main integrated supplier, with digital workflows inside the delivery model.
🔗 SLB says it will connect planning and execution and simplify interfaces, working closely with Vår Energi and other selected service and technology providers, in an integrated delivery model that brings together technical expertise, digital workflows and operational execution across well delivery.
The selection extends an existing relationship in digital well and field development planning and, through SLB's OneSubsea joint venture, subsea production systems.
🎯 Your move: ask for a contract annex that lists, by name, each data set and workflow the integrated model will run on your wells (WillCo analysis).
📜 Key Development: McKinsey Says Dayrate Contracts Send Much of AI's Efficiency to the Operator
McKinsey: AI Is Forcing a Rethink of Drilling Contracts, From Who Owns the Data to Who Gets the Upside
Drilling Contractor, November 10, reporting a talk given October 6 at the IADC Contracts & Risk Management Conference in Houston.
Under a dayrate, McKinsey says, much of AI's efficiency flows to operators; it expects tenders to split drillers into activity providers and performance partners, and only partners are likely to share the upside.
💸 Bill Ambrose, a partner at McKinsey & Company, laid out the drillers' dilemma at the conference: for a business paid by the day, a shorter well means less revenue per well. McKinsey's August 2026 well delivery analysis puts that cut at 9 to 12% of well construction time.
Ambrose's five questions for every tender:
🎯 Define success: how to reward lower total well cost while preserving safety, well quality and a sustainable contractor return after AI costs.
💰 Make investment recoverable: how contractors recover AI investment over several drilling programs or several years, not just the next well.
🔐 Enable access without surrendering differentiation: what customers can and cannot take from a contractor's data, and the reverse for operator data embedded in contractor tools.
📏 Make performance evidence sufficient to earn payment: "How do you prove performance without showing all the inner workings of your models?"
⚖️ Align authority with accountability: comparing today's AI decision support to cruise control, Ambrose said contracts will need to settle which decisions AI may make, who can override them, and how accountability, liability and compensation change with that authority.
💰 McKinsey sizes the prize at more than $230 billion a year across 550+ upstream AI use cases; real-time ROP optimization ranks third at $16 billion, and predictive maintenance accounts for $11 billion.
🗂️ Data ownership is the other knot. Traditionally, operators own well programs, geology and downhole measurements; drillers own rig sensor data, equipment condition records and billing; service companies and equipment makers own their own data. The hard case: can a contractor combine training on an operator's 1,000 wells with the 50,000 wells already in its own model?
Ambrose said some McKinsey clients have spent nearly a year working out questions like that about a counterparty's data. Drillers also worry about a ratchet effect, where each improvement raises the bar for the next incentive.
🎯 Your move: put Ambrose's five questions into your next tender as numbered clauses, each with a named owner on both sides (WillCo analysis).
🛡️ Key Development: Havtil Writes Up Four Non-Conformities on Automated Drilling and Audits How Operators Qualify AI
The COSLPioneer Findings, a February Order on Qualification Criteria, and an Ongoing Series of AI Audits That Includes Aker BP's Yggdrasil
Havtil news, November 9, with Havtil audit reports published October 26 and February 6.
The Norwegian Ocean Industry Authority (Havtil) wrote up four non-conformities and one improvement point after auditing how Vår Energi and COSL introduced automated drilling on COSLPioneer, and says it is now auditing how operators qualify AI, including the AI Aker BP will introduce at Yggdrasil, where control and monitoring will largely be carried out from shore.
🚨 Havtil audited Vår Energi and COSL Offshore Management (COSL) on the risk assessment, introduction and use of automated drilling operations on COSLPioneer, August 17 to 21, and found four non-conformities:
Deficiencies in analyses.
Deficiencies in work processes and procedures.
Inadequate follow-up of the supervisory responsibility.
Insufficient involvement and employee participation.
The improvement point was inadequate training and preparation. Havtil also gathered information on how the people involved monitored the systems during operation and how the systems were managed in the event of a technical failure.
📅 December 2025: Havtil audits Vår Energi; the report identifies three non-conformities, in technology qualification, analyses and non-conformity handling, that Havtil called serious breaches of the regulations.
📅 February 5, 2026: order to Vår Energi to prepare criteria for the development, testing and use of automated drilling technologies, representative of the current conditions of use and in place before the systems are taken into use, with a time-delimited, binding plan due within two weeks.
📅 August 17 to 21, 2026: the COSLPioneer audit of Vår Energi and COSL described above; Havtil published the report on October 26.
📅 November 9, 2026: Havtil says it is running a series of audits on how operators manage risk and qualify new technologies such as AI; the recent Aker BP Yggdrasil audit is one of them.
In the order's background, Havtil writes that companies are introducing automated solutions at a rapid pace, and that the industry does not always manage to change its work processes at the same pace.
🎯 Your move: for each automated system on your rigs, check that written qualification criteria exist, that they match the conditions the system will actually see, and that they are dated before first use (WillCo analysis).
🔬 Key Development: Read the Cement Before You Call the Rig
Halliburton Launches Through-Tubing Cement Evaluation for P&A Planning; GOWell Buys WellSense for Fiber Sensing
Halliburton press release, November 11; GOWell release dated November 11, furnished to the SEC on Form 6-K.
Two well-integrity moves on the same day: a new through-tubing cement evaluation service designed to read the well before the rig is mobilized for plug and abandonment, and an acquisition that adds distributed fiber sensing to well logging.
Halliburton says its new IntelliTTCE service checks zonal isolation through tubing before plug and abandonment (P&A) work, so operators can avoid unnecessary tubing retrieval where conventional workflows often require tubing removal and rig mobilization. It pairs two independent deterministic evaluation methods with high-resolution azimuthal cement mapping.
🧭 Halliburton frames the aim as moving from contingency-based planning to planning based on actual well conditions, defining scope and sequence before key planning decisions are made. Its product page describes the method as rigless.
GOWell bought Aberdeen-based Well-Sense Holdings (WellSense), taking its well-integrity offering from point measurements to continuous distributed fiber optic sensing (DFOS). GOWell says WellSense's drop-in deployment model fits its approach of delivering technology through service company partners.
"Fiber sensing locates problems along the well; our logging technologies identify and characterize them precisely," said Guillaume Borrel, GOWell's Chief Executive Officer.
🎯 Your move: before the next abandonment or integrity campaign, name the planning decision the evidence must inform, and check whether that evidence can be gathered before the rig is mobilized (WillCo analysis).
📋 In Brief
Each item ends with a question to put to your own team (WillCo analysis).
Models and measurement
🧠 SPE Journal: 92.92% operating-state recognition on an independent well, plus early warning of pipe sticking: the 92.92% belongs to the framework's operating-state recognition model; its anomaly model found early-warning evidence of pipe sticking and earlier kick confirmation in the study data. The authors leave vibration-related events to post-run diagnosis until low-rate downhole vibration descriptors can be transmitted to surface. (SPE Journal, November 2026.) Has your model been scored on a well it never trained on?
🧪 Mud rheology from three routine mud measurements, R² of 0.963: a JPEPT paper predicts plastic viscosity, yield point and gel strengths from Marsh funnel viscosity, solids percentage and density (388 observations, nine wells; hybrid stacking model). The authors say validation on unseen wells is required before field use. (JPEPT, November 13.) How many hours pass between your rheology checks, and what changes in between?
↪️ Patterson-UTI: field lessons can lead to CORTEX Driller algorithm upgrades. A follow-up to Edition 25. Alex Groh, Senior Manager, Data Science, says lessons from field monitoring at the PTEN Digital Performance Center go to design teams and can lead to software upgrades, among them an upgrade to the machine-learning algorithms behind CORTEX Driller with Adaptive Gains. (Drilling Contractor video series, part 2, November 10.) Who on your side carries field lessons into the next software release?
Rigs and markets
🌊 Weatherford wins MPD work for the Amaralina Star exploration campaign offshore Brazil: Constellation Oil Services contracted Weatherford for deepwater managed pressure drilling (MPD) on an exploration campaign run by the ultra-deepwater drillship Amaralina Star. The award combines an initial 12-month rental, the sale of an MPD system to be delivered within 12 months and a two-year aftermarket contract, a structure Weatherford says could lead to longer-duration work. (Drilling Contractor, November 16.) Does your MPD contract cover the control data, or only the equipment?
🏠 Bedrock Energy raises $24 million to scale sensor-guided drilling for ground-source geothermal heating and cooling: CEO Joselyn Lai says its drilling system captures 36 data points per second, and that the bore-field digital twin, which keeps updating while drilling, can potentially save a customer 20% to 30% on the bores they design. Heatmap reports bores sometimes deeper than 1,000 ft, whereas traditional ground-source wells often bottom out around 500 ft. (Heatmap, November 16.) Does your model keep learning once the bit is turning?
📡 On WillCo's Radar
Why it matters: TechCrunch reports that mud can only cool the bit so far before the electronics that keep it on course start to fail. CEO Sriram Vasantharajan tells TechCrunch that high-temperature-rated electronics would be cost prohibitive and that, without such cooling, he cannot today drill horizontal wells at superhot rock temperatures.
Mazama raised $135 million in September, TechCrunch reports. By next year, Vasantharajan says, Mazama hopes to complete a single well capable of generating up to 15 megawatts.
💵 ARPA-E selects eight SUPERHOT projects that could receive up to a combined $30 million (ARPA-E, November 12): the selections include Blade Energy Partners, $6.3 million for an integrated well system meant to hold well integrity for more than 15 years; Oak Ridge National Laboratory, $3.0 million for a composite pipe system aimed at a 15-year well lifetime; and the University of Southern California, $3.0 million for a new well casing architecture.
🔭 What We're Watching Next
All three items come from the IADC Geothermal Drilling 2026 week in Copenhagen.
🌍 Does an urban rig with automated pipe handling hold up across a five-year geothermal contract? The CityRig 500 will move to Copenhagen after its first job in Bavaria; watch for the published outputs of the talk by Herrenknecht Vertical's Malte Damm at IADC Geothermal Drilling 2026 (Copenhagen, November 17 to 18).
🔍 Can cutter-by-cutter dull-bit digitization become the evidence a performance contract pays on? Watch for the published outputs of the grA+de talk by APIteq's Per Erik Berger and Trax Electronics' Séan Emery at the same conference; grA+de is an autonomous dull-bit forensic digitization system.
🔥 How should a crew quench a well after an aquathermal event? A hands-on geothermal well control simulator workshop on exactly that, led by Toney Deer (Well Control School) and Shennon Shen (Sim2Meta), runs in Copenhagen on November 19; the IADC Geothermal Committee meets the same day.
Ownership and qualification are now the same conversation.
Under a dayrate, the contract, not the code, decides who keeps the saving.
The SLB selection, the McKinsey talk and Havtil's records on Vår Energi, including the COSLPioneer audit of a rig not covered by the SLB selection, are separate events, but they put one question on the table: who owns the workflow, and what record proves it works where it will run.
The tension sits between offline accuracy and the conditions of use. The SPE Journal framework from In Brief scores 92.92% on an independent well for operating-state recognition, yet its authors defer vibration events to after the run for now. Havtil's order asks for criteria that reflect the conditions under which the system is used today. A model is qualified for the telemetry and the crew it will meet, not for the dataset it was trained on.
Evidence is also moving to where the decision is made. IntelliTTCE is built to read the cement before the rig is called, GOWell adds distributed fiber to its logging, and Mazama treats tool survival at temperature as the condition for drilling horizontal superhot wells.
For operators, drilling contractors and technology providers, the implication is the same: write the ownership terms and the qualification record together, before the first well. A workflow nobody owns cannot be qualified, and one nobody has qualified will not earn a performance payment.

✅ Practical Recommendations
For operators, drilling contractors and technology providers: one register for who owns each workflow, one dated file for what qualifies it. (WillCo analysis)
🗂️ Operators, this week: keep one ownership register per rig. One page listing each digital service, the definitions it relies on, today's owner and the owner after the term ends.
⚖️ Operators and drilling contractors, before the next tender: settle authority before price. Agree for each automated function the decision it may take, who may override it, and the log that settles disputes over the result.
🛡️ Drilling contractors and technology providers, before the first automated well: date the qualification file. Development, testing and use criteria matched to real conditions, with crew involvement and training recorded and signed before first use.
🧪 Technology providers, before the next release: test at rig telemetry rates. Score every model on an independent well, using the data rates your customers' rigs actually transmit.
🔬 Operators, at the next abandonment or integrity scope: run the diagnostic first. Put it ahead of the scope freeze and the rig call, and record which scope item the run changed.
🛠️ Before your next tender, see where one rig stands.
Score one rig in 15 questions, free on the Closed-Loop Readiness scorecard.
You get a readiness profile across five dimensions (data foundation, analytics and modeling, rig-control integration, governance and strategy, and operations and human factors). The governance and human-factors gaps it flags are the ones to close in your ownership register (step 1) and your dated qualification file (step 3).
📚 References and Sources
"SLB Selected by Vår Energi for Integrated Drilling Services Offshore Norway" - SLB press release, Nov 12, 2026. https://www.slb.com/newsroom/press-release/2026/pr-2026-1112-slb-var-energi
Stephen Whitfield. "McKinsey: AI is forcing a rethink of drilling contracts, from who owns the data to who gets the upside" - Drilling Contractor, Nov 10, 2026. https://drillingcontractor.org/mckinsey-ai-is-forcing-a-rethink-of-drilling-contracts-from-who-owns-the-data-to-who-gets-the-upside-80922
"Havtil conducts audits on the use of artificial intelligence" - Norwegian Ocean Industry Authority (Havtil), Nov 9, 2026. https://www.havtil.no/en/explore-technical-subjects2/technical-competence/news/2026/havtil-conducts-audits-on-the-use-of-artificial-intelligence/
"Vår Energi and COSL - automated drilling operations" - Havtil audit report, Oct 26, 2026. https://www.havtil.no/en/supervision/audit-reports/2026/var-energi-and-cosl--automated-drilling-operations/
"Vår Energi - risk assessment and qualification of automated drilling operations" - Havtil audit report and order, Feb 6, 2026. https://www.havtil.no/en/supervision/audit-reports/2026/var-energi--risk-assessment-and-qualification-of-automated-drilling-operations/
"New IntelliTTCE service provides early well insight for offshore plug and abandonment planning" - Halliburton press release, Nov 11, 2026. https://halliburton.com/en/about-us/press-release/new-intellittce-service-provides-early-well-insight-offshore-plug-abandonment-planning
"IntelliTTCE service" - Halliburton product page. https://www.halliburton.com/en/products/intellittce-service
"GOWell Acquires WellSense to Expand Global Well Integrity and Fiber Optic Sensing Capabilities" - GOWell Energy Technology release dated Nov 11, 2026, furnished to the SEC on Form 6-K, Exhibit 99.1. https://www.sec.gov/Archives/edgar/data/2097702/000121390026118259/ea031154301ex99-1.htm
Huohai Yang, Haoran Zheng, Lei He, Hao Song, Mingzhou Zhang, Renze Li, Fuwei Li (Southwest Petroleum University; PetroChina Xinjiang Oilfield; PetroChina Southwest Oil & Gas Field). "An Integrated Autoencoder-Isolation Forest and Temporal Convolutional Network-Transformer Framework for Intelligent Operating-State Recognition and Anomaly Early Warning Using Multisource Drilling Time-Series Data," SPE-236996-PA, SPE Journal, 2026. DOI: 10.2118/236996-PA. https://doi.org/10.2118/236996-pa
Jannatul Karimoon, Md. Sumon Miah, Soraiya Sayeed Mona, Md. Ashiqul Islam Shuvo, Mohammad Mamun-Ur-Rashid. "Data-driven prediction of drilling fluid rheology: a hybrid machine learning approach," Journal of Petroleum Exploration and Production Technology, Nov 13, 2026. DOI: 10.1007/s13202-026-02244-3. https://doi.org/10.1007/s13202-026-02244-3
Stephen Whitfield. "Patterson-UTI Digital Series, Part 2: Machine learning meets the rig through automation feedback loop" - Drilling Contractor, Nov 10, 2026. https://drillingcontractor.org/patterson-uti-digital-series-part-2-machine-learning-meets-the-rig-through-automation-feedback-loop-80824
"Constellation taps Weatherford for MPD on Amaralina Star exploration campaign offshore Brazil" - Drilling Contractor, Nov 16, 2026. https://drillingcontractor.org/constellation-taps-weatherford-for-mpd-on-amaralina-star-exploration-campaign-offshore-brazil-81073
Katie Brigham. "Bedrock Energy Raises $24 Million to Mainstream Small-Scale Geothermal" - Heatmap News, Nov 16, 2026. https://heatmap.news/climate-tech/bedrock-energy-24-million
"Mazama Energy Achieves Drilling Breakthrough That Advances the Economics of Superhot Geothermal" - Mazama Energy release (GlobeNewswire), Nov 16, 2026. https://www.globenewswire.com/news-release/2026/11/16/3403585/0/en/mazama-energy-achieves-drilling-breakthrough-that-advances-the-economics-of-superhot-geothermal.html
Tim De Chant. "Mazama Energy has a solution for geothermal's biggest drilling problem" - TechCrunch, Nov 16, 2026. https://techcrunch.com/2026/11/16/mazama-energy-has-a-solution-for-geothermals-biggest-drilling-problem
"DOE's ARPA-E Announces Up to $30 Million to Advance Geothermal Projects in SUPERHOT Program" - ARPA-E release, announced Nov 12, 2026 (as published by POWER, Nov 13). https://www.powermag.com/does-arpa-e-announces-up-to-30-million-to-advance-geothermal-projects-in-superhot-program/
"SUPERHOT Project Descriptions" - ARPA-E, Nov 2026. https://arpa-e.energy.gov/sites/default/files/2026-11/SUPERHOT_Project_Descriptions_v2.pdf
"IADC Geothermal Drilling 2026" - IADC conference program, Copenhagen, Nov 17 to 18, 2026. https://iadc.org/event/iadc-geothermal-drilling-2026/
"Hands-on geothermal well control workshop to follow IADC Geothermal Drilling 2026" - IADC DrillBits, Nov 12, 2026. https://iadc.org/drillbits/industry-events/hands-on-geothermal-well-control-workshop-to-follow-iadc-geothermal-drilling-2026/
"IADC Geothermal Committee to Meet in Copenhagen on 19 November" - IADC DrillBits, Nov 12, 2026. https://iadc.org/drillbits/iadc-geothermal-committee-to-meet-in-copenhagen-on-19-november/
Prior WillCo Drilling Intelligence editions and archive - https://willcodrilling.com/blog
About this report: The WillCo Drilling Intelligence Report is a weekly synthesis of verified developments in digital drilling and well construction, published by WillCo Drilling Consulting. Analysis, forecasts, and recommendations reflect WillCo's independent engineering perspective.



Comments