top of page


WillCo Digital Drilling Intelligence - Edition #20: The Seam Is the New Bottleneck. Oct 5 - Oct 11, 2026
The next digital bottleneck in drilling is the handoff, not the stage. Edition 20: Vår Energi compresses well-concept maturation from weeks to days by re-engineering how disciplines hand off work; a downhole motor-diagnostics study pushes fault detection toward the sensor; Nabors folds managed pressure drilling into its rig operating system; and Valaris earns a barrier-assurance award for BarrierPulse. Plus Fervo's Cape Station commercial operation and a GA Drilling hard-rock

William B. Contreras
Oct 712 min read


WillCo Digital Drilling Intelligence - Edition #19: Drilling Automation at Scale. Sep 28 - Oct 4, 2026
This week the test for drilling automation shifted from 'does it work' to 'does it hold across hundreds of wells.' SLB won four multi-year integrated well-construction contracts from Aramco covering more than 450 wells; WesCan steered a seven-leg multilateral to TD in 13 days; Fervo reported first power at Cape Station; Zefiro drilled a first carbon-storage well by redeploying a plugging crew; and a new patent application puts +/-10,000 lbf on a quiet weight-on-bit error. Sca

William B. Contreras
Sep 309 min read


WillCo Digital Drilling Intelligence - Edition #18: Automation Is Becoming Infrastructure. Sep 21-27, 2026
Halliburton's multi-year Eni contract for the Cronos development bundles automation and remote operations into the well-construction scope, while deepwater managed pressure drilling standardizes inside the rig operating system. This week, automation stops being a pilot and becomes infrastructure.

William B. Contreras
Sep 2312 min read
bottom of page